SARI, S. N.; ANGGI HERMAWAN; CHANDRA WAHYU HERBYANTO. Analisis Percepatan Proyek Menggunakan Metode Crashing Dengan Penambahan Tenaga Kerja Dan Shift Kerja (Studi Kasus: Proyek Pembangunan Jembatan Damai, Kalimantan Timur). ReTII, [S. l.], p. 597–607, 2022. Disponível em: https://sandbox.itny.ac.id/index.php/ReTII/article/view/3713. Acesso em: 20 jul. 2025.